How long does joint compound take to dry. Patching or finishing drywall is an easy way to give your home a real makeover and improve your paint job. Applying multiple coats of wet joint compound over the seams can take up to a week to dry.
Temperatures and humidity determine how long it takes to fully dry, so depending on how long you wait, it could take weeks.
It is important not to get discouraged, but sometimes waiting for the paint to really settle into the walls can feel endless.
How long does joint compound take to dry
Under conditions of a temperature of seventy degrees Fahrenheit and 70 percent humidity, the joint compound should dry in about 24 hours.
Higher humidity and/or lower temperatures will lead to increased drying times.
You should apply thinner coats
Applying thinner layers of drywall mud (the thick consistency compound known as the substrate that you apply before paint) means that it will take less time to dry between coats.
By applying one layer, allowing it to dry, and then applying successive thinner coats, you’ll cut down on overall drywall application times.
It’s always a good idea to allow each subsequent coating to completely dry before adding another coat.
Circulation of air
After you’ve applied the initial layer of joint compound and before it dries completely, cracks a window.
The fresh air will relieve the humidity inside the room so that by the time the joint compound is dry, it’s cured as quickly as possible.
Besides opening a window for some fresh air, place a fan in your workspace to circulate the air to help things dry out faster. This way you’ll get done with your project much more efficiently before it starts raining real deal nails.
Increase the temperature
When working in an area where drywall is needed but it’s too cold to dry it, either run the heater or place heaters underneath the floors and on walls.
For a small patch of wall, use a hairdryer that you hold about three feet away from the patch directly on the sheets. Keep it constantly moving so as not to burn it.
Adding Dehumidifiers to the Air
Make sure the room has proper ventilation and set up a dehumidifier in the room. The drywall mud is loaded with water, so a dehumidifier will accelerate the process of draining it so the wall system can dry.
Go ahead and check on it as needed too. As an extra precaution against water damage, protect your furniture and appliances by moving them away from the wall.
Apply hot mud
For time-sensitive projects, you can use a special type of compound called “hot mud.”
Hot mud is the name given to plaster that has had water added to it right before the drying stage.
Mixing hot mud with water can take anywhere from 20 minutes to an hour or more.
It depends on how thick you make the final product, as this will directly affect its quick-setting properties – so obviously faster drying times are preferable.
Alternatively, if you want a longer-lasting albeit heavier plaster cast (as opposed to lightweight paper) then obviously slower dry times would be perfect for your goal and needs.
As with many things in life, good old trial and error go hand-in-hand here to start off by using hot mud on small projects first so as to get used to how it works.
And then once that’s done continue on to larger-scale projects which later down the line should require less skill and in turn give you years of experience with hot mud usage.
How long does joint compound take to dry